FOLLOWING STEPS HAVE BEEN COMPLETED:
- BEFORE photos uploaded to BurialApp?
- Standard dept reached? (min 6 inch) — MAJOR FAILURE — IF NO – reason added to the comments
- Connectors properly installed? — MAJOR FAILURE —
- CSE and PED/TAP properly closed and locked? —- IF NO – reason added to the comments
- Connector weather proofing installed?
- Correct cable type used (RG6/RG11)? — MAJOR FAILURE — IF NO – reason added to the comments
- TAP accessed properly? (e.g. No drilling) —- IF NO – reason added to the comments
- Z-Markers installed?
- Empty spigots terminated in PED?
- Temp line completely removed? — MAJOR FAILURE — IF NO – reason added to the comments
- Gaps filled? (Asphalt/Polymeric sand)
- Service loops maintained? —- IF NO – reason added to the comments
- All exposed cables buried or removed? —- IF NO – reason added to the comments
- All Cleaned? (Residue sand, garbage, tape removed) —- IF NO – reason added to the comments
- Final inspection done before leaving? (spade line gap closed, tools collected, grounds restored)
- ALL necessary comments added? (any irregularity, additional comments, driveways passed)
- Completion photos uploaded? (Details and full path 5-7 photos )