Burial Completion Confirmation

FOLLOWING STEPS HAVE BEEN COMPLETED:

  1. BEFORE photos uploaded to BurialApp? 
  2. Standard dept reached?  (min 6 inch) — MAJOR FAILURE — IF NO – reason added to the comments
  3. Connectors properly installed? — MAJOR FAILURE —
  4. CSE and PED/TAP properly closed and locked? —- IF NO – reason added to the comments
  5. Connector weather proofing installed? 
  6. Correct cable type used (RG6/RG11)?   — MAJOR FAILURE — IF NO – reason added to the comments
  7. TAP accessed properly? (e.g. No drilling) —- IF NO – reason added to the comments
  8. Z-Markers installed?
  9. Empty spigots terminated in PED?  
  10. Temp line completely removed?  — MAJOR FAILURE — IF NO – reason added to the comments
  11. Gaps filled? (Asphalt/Polymeric sand)
  12. Service loops maintained?  —- IF NO – reason added to the comments
  13. All exposed cables buried or removed?  —- IF NO – reason added to the comments
  14. All Cleaned? (Residue sand, garbage, tape removed) —- IF NO – reason added to the comments
  15. Final inspection done before leaving? (spade line gap closed, tools collected, grounds restored) 
  16. ALL necessary comments added? (any irregularity, additional comments,  driveways passed)
  17. Completion photos uploaded?  (Details and full path 5-7 photos )