Burial Completion Checklist

DescriptionImportance
MAJOR - 1 issue to fail
MINOR - 2 issues to fail
Comments
1. BEFORE photos uploaded to BurialApp?Minor Issue
2. Standard dept reached?  (min 6 inch) MAJOR issueIF NO - reason added to the comments
3. Connectors properly installed? MAJOR issue
4. CSE and PED/TAP properly closed and locked? Minor IssueIF NO - reason added to the comments
5. Connector weather proofing installed?Minor Issue
6. Correct cable type used (RG6/RG11)?   MAJOR issueIF NO - reason added to the comments
7. TAP accessed properly? (e.g. No drilling) MAJOR issueIF NO - reason added to the comments
8. Z-Markers installed?Minor Issue
9. Empty spigots terminated in PED?Minor Issue
10. Temp line completely removed?  MAJOR issueIF NO - reason added to the comments
11. Gaps filled? (Asphalt/Polymeric sand)Minor Issue
12. Service loops maintained?  Minor IssueIF NO - reason added to the comments
13. All exposed cables buried or removed?  Minor IssueIF NO - reason added to the comments
14. All Cleaned? (Residue sand, garbage, tape removed) Minor IssueIF NO - reason added to the comments
15. Final inspection done before leaving? (spade line gap closed, tools collected, grounds restored)Minor Issue
16. ALL necessary comments added? (any irregularity, additional comments,  driveways passed)Minor Issue
17 Completion photos uploaded?  (Details and full path 5-7 photos )Minor Issue